PowerPack PP1
To keep the Waterra PowerPack PP1 in optimum condition, a programme of regular servicing & maintenance is necessary following the recommendations in the operation manual. Two service intervals are specified:
100 hour or 6 months (whichever occurs first)
- a basic clean up and check of the actuator mechanism combined with an engine service. Belts replaced if necessary.
200 hours or 1 year (whichever occurs first)
- a more throrough engine and actuator service including replacement of belts and other worn parts (itemised and charged separately)
Check out the service options below or call +44 (0)121 733 7743 for more information.
PP1 Service - 100hr (6 months)
Keep your PP1 in condition with our 100 hour service including clean up and overall check of the actuator mechanism, engine service, drive belt assessment and retensioning where needed, regreasing and servicing of the engine.
|
|
|
|
|
|
SERVPP1-F6
|
PP1 Full Actuator and Engine Service (100 hrs / 6 months)
|
|
|
PP1 Service - 200hr (12 months)
A more detailed overhauls of the actuator mechanism including clean up and overall check of the actuator mechanism, drive belt assessment and retensioning and/or replacement where needed,bearing replacement and regreasing and servicing of the engine. Other parts assessed and replaced. All parts are separately chargeable for which a quotation will be provided.
|
|
|
|
|
|
SERVPP1-F12
|
PP1 Full Actuator and Engine Service (200 hrs / 12 months)
|
|
|
PP002
|
PP1 timing belt - 16 wide
|
|
|
PP003
|
PP1 timing belt - 25 wide
|
|
|
PP031
|
PP1 Oilite Bearing (qfm 10-12)
|
|
|
PP1 Parts
Replacement parts available from stock. For parts not listed please contact the Waterra Sales office
|
|
|
|
|
|
PP004
|
PP1 ratchet strap system
|
|
|
PP018
|
PP1 tube guide assembly (original style)
|
|
|
PP022
|
PP1 cartons and inserts
|
|
|
PP026
|
PP1 clamping system assembly (New Style) - must include PP017
|
|
|
PP060
|
PP1 - SAE 10W-30 Engine Oil (100 ml)
|
|
|